Web Catalogue update October 2019

K-PLUS - DIRECTIONS FOR USE Professional Body Filler Base: The surface must be clean and grease free. To achieve good adhesion be sure that the surface is rough. Do not use this product over a thermoplastic acrylic system (acrylic or lacquer primer surfaces). 05 3622 Mixing: No more than 2 (by weight) parts of hardener paste should be added to 100 parts of K-Plus Filler. Excessive amounts of hardener paste can result in peroxide bleaching of the paint. Mix until uniform colour is observed. Working Time: Working time is the processing time (4-5 minutes) after the Filler and the Hardener are mixed together. Hardening Time: This is the amount of time until the repaired base can receive further work. At 20 o C 15–20 minutes is normally required before the filler can be sanded. When temperature is warmer the drying time shortens: If the temperature is cooler the drying time lengthens. To gain time in the drying process, in winter, it is advised that metal surfaces are warmed using infra-red or other heat lamps prior to application. Finishing: The surface must be dry before finishing by sanding or filing. Sand with 40 - 180 grit paper. 2% hardener 4-5 min. 20°C 15-20 min. 20°C P40 - 180 NZ. pub. 10/14 ©

RkJQdWJsaXNoZXIy MTI2NzU=