Der Blätterkatalog benötigt Javascript.
Bitte aktivieren Sie Javascript in Ihren Browser-Einstellungen.
The Blätterkatalog requires Javascript.
Please activate Javascript in your browser settings.
THE GLOBE Coburg Germany 28 000 ASSY ® SCREWS FOR A TIMBER-HYBRID-BUILDING • The main building is made out of crosslaminated timber structure The three outbuildings are entirely of timberframe construction • Timberconcrete composite construction method scores with high loadbearing capacity and good vibration behavior Customized service within each phase of construction • Technical support through the Würth Technical Key Account Management and personal consultation in the holistic planning process • Planning with the Würth Technical Software II within all construction phases • BAULOC ® Shop provides an adapted product range according to the construction phase and a reduction of downtimes on the site Tailormade prefabricated concrete slabs shorten the construction time • Prefabricated concrete components are supplied with integrated Würth castin FT connectors and screwed to the timber components on the construction site • The use of precast concrete elements for the timberconcrete composite fl oors eliminates the drying time and the slabs can be loaded directly after the composite has been produced About the project • Theatre with up to 567 seats • Round building made of timber from sustainable managed forests • Construction period 2020 – 2023 • Project volume 35 5 million EUR Adolf Würth GmbH Co KG · 74650 Künzelsau · T 07940 15-0 · F 07940 15-1000 · info@wuerth com · www wuerth de © In ge ni eu rg ru pp e Kn ör ns ch ild Kol le ge n Glo be -Th ea te r i n Co bu rg 2 02 2 MWC - IDB - IDC - H01774 - 03 23 Anchor Design • Automatic product proposal • Flexible geometry editor • User input concrete compressive strength • Automatic selection of governing load case • Detailed printout with references to the code and approval for convenient reviews